Box Hill · VIC 3128
Interior, kitchen and bathroom renovations in Box Hill.
Mel One renovates Box Hill living spaces, kitchens and bathrooms with a focus on practical room use and clean adjoining finishes. In an apartment, retained fixture positions and protected shared access can be as important as the new cabinetry or tiles.
Improve the room without changing everything around it.
A kitchen can have worn doors, awkward storage and a damaged splashback while its basic layout still works. We separate the items that can stay from cabinetry, surfaces and finishes that need renewal. In bathrooms, the same distinction starts with the vanity, shower arrangement and surrounding condition. Moving a sink, waste or wall is treated as a separate change, rather than an automatic part of a cosmetic update.
Protect the apartment and the route through the building.
Before removal, we protect retained floors, doorways and the agreed material route, and identify the fittings being reused. Kitchen contents and loose bathroom items are cleared before that work starts. We plan deliveries and waste movement around the building’s lift and common-area arrangements. Work affecting shared services or common property requires the relevant authorisation before those elements are altered.
Remove worn finishes and rebuild the agreed areas.
A retained-layout kitchen may involve removing selected cabinets and splashback materials, making good the wall behind them, then installing the new cabinetry, worktop and finishes. For a bathroom renewal, the substrate and wet-area system need assessment before new surfaces cover them. Plumbing, electrical and regulated building work must sit with appropriately qualified responsible practitioners. New fittings are installed only after their supporting work is ready.
Check storage, edges and everyday use.
Finishing includes the junctions customers notice each day: cabinet doors meeting evenly, drawers clearing adjacent handles, trim meeting the floor, and splashback edges meeting the worktop. Where flooring is included, door clearance and transitions to retained rooms are checked. Bathroom handover checks follow the agreed work and responsible trades. A neat surface is considered together with usable access, not judged only from a photograph.
Define a floor-only job from removal to the finished edges.
For a Box Hill apartment kitchen keeping its fit-out, identify the existing floor finish, damaged areas and the proposed replacement. The scope should distinguish old tile and adhesive removal, waste handling, base preparation, any level correction, laying and grouting, and edges at the cabinets and doorway. If the base cannot yet be assessed, we identify what needs investigation before confirming that allowance. The proposed layers also need to suit retained doors and appliance clearances; a tile-supply price alone does not describe this work.
Prepare a product and work brief for building management.
Before ordering, ask management what information they need for the proposed floor change. Useful material can include the current finish, replacement product data, the proposed layer sequence, and a simple plan marking the kitchen area and retained adjoining floor. Add the intended removal method, delivery and waste route, and proposed work times. Management can identify applicable building procedures or further information required; selecting a product does not establish that it has been accepted for the building.
Explore other Melbourne areas
Before you get started
Can the kitchen be renewed while the sink stays in place?
Yes, that can be the agreed approach when the existing arrangement remains suitable. Cabinets, worktops and surrounding finishes can be renewed around retained positions; any required disconnection, reconnection or service alteration remains the appropriate practitioner’s work.
Is new tile over an old bathroom finish always enough?
No. Loose surfaces, damaged backing or a compromised wet-area system need investigation. The appropriate scope may require removing affected layers and rebuilding the support and waterproofing system before tiling; grout or a new surface does not resolve every underlying problem.
How does apartment flooring affect the renovation?
The selected floor build-up must suit the building and room. Common-property boundaries and any building requirements need checking, while the installation scope includes transitions, retained doors and cabinet interfaces rather than treating the floor as an isolated finish.
What information helps management review a kitchen floor-only change?
Ask which documents the building requires, then provide the existing and proposed finishes, product data, proposed layers and a marked work area. Include removal, delivery, waste and work-time arrangements. The submission can be refined with management; it is not a guarantee of approval or a substitute for assessing the existing base.
Mel One Maintenance
Tell George what you have in mind.
Send your suburb, work list, current photos and the things you want to keep or improve. We can discuss a useful next step for the proposed scope.
0450 666 876admin@elliservices.com.auAbout Mel One ↗